Roadway Design

Preliminary Engineering | Resurfacing | Reconstruction | Pavement Design | TCP/MOT | Post Design Services

As a firm focused solely on transportation engineering, ICON is adept at managing and delivering the successful highway design services that make up the Major Work elements of many contracts. With a Vision Zero mindset, ICON strategizes to make our streets the safest possible and implement a highway system that aims to achieve no fatalities or serious injuries. We are committed to being responsive, providing innovative and cost-effective solutions, technical competence, and professional integrity.

I-75 at Fruitville Rd DDI

This design project includes the widening, reconstruction and resurfacing of I-75 and Fruitville Road to accommodate the future 10-lane interstate typical section DDI configuration.

SR 54 from Suncoast Pkwy to US 41

This design-build project involved the widening of SR 54 from 4-lanes to 6-lanes, from east of Suncoast Parkway to west of US 41.

SR 555 at Spirit Lake Rd

This intersection improvement project reconstructs the existing roadway from flexible asphalt pavement to rigid concrete pavement within the functional area of the intersection.

SR 551 (Goldenrod Rd) from SR 15 to SR 552 and from SR 50 to SR 426

Developing construction plans for milling, resurfacing and restoring pavement for the four-lane divided highway, along with ADA, safety and access management improvements of SR 551.